Sample Perimeter Installation
This sample perimeter frame installation shows the result of 15 VeriClad™ panels (4’ wide by 4” thick by 11’9” long) being installed as a structural sub-floor system in a “nested” configuration into a perimeter frame for a 12’ x 60’ module. The long sides of the panels run the width of the module. The panels are simply supported at the panel ends (providing for a clear-span underside), and they are attached to the frame via 6" self-drilling/self-tapping screws to 3x3” angle welded onto the flat web of a C8 or C10 perimeter frame (with the flanges of the C's facing out).
| File Format |
Installation Detail |
Link |
|

|
Sample Perimeter Frame ("Nested") Installation Detail Veristeel® VeriClad(TM) Sample Perimeter Frame Installation (VS-PF-060607)
|
Open Drawing | * The sample installation designs provided herein are general representations provided for informational purposes only and they should not be considered as or used as engineered drawings for construction purposes.
|